International Commercial Contracts

Equipment Supply & Installation Coordination

We coordinate the commercial side of equipment supply-and-install and EPC packages with qualified engineers and counsel.

Who this is for

  • Buyers of plant or machinery that must be delivered, installed and commissioned
  • Suppliers delivering supply-and-install or EPC-style packages
  • Project owners managing several contractors on one site

Typical problems

  • “Delivery happened, but installation is months behind.”
  • “Each contractor blames the other for the delay.”
  • “We do not know when liquidated damages start to run.”
  • “The acceptance test keeps being postponed.”

Scope

What we coordinate

  • Building interface and milestone schedules across suppliers and installers
  • Tracking liquidated-damages triggers, caps and notices
  • Organising acceptance and commissioning records
  • Coordinating chartered engineers and construction counsel where needed

What we do not do

  • We do not take engineering design responsibility
  • We do not certify equipment, installations or test results
  • We do not give legal opinions on construction contracts

Deliverables and documents

  • Interface and responsibility matrix
  • Milestone and payment schedule
  • Liquidated-damages tracker
  • Acceptance and commissioning record
  • Delay and notice correspondence log

How an engagement runs

  1. Enquiry

    You describe the matter in outline, without confidential documents.

  2. Eligibility and risk screening

    We check the matter against our responsible-business policy and screen the parties, goods and jurisdictions involved.

  3. Scoping

    We agree the questions to be answered, the documents needed and the people involved on each side.

  4. Proposal and fee basis

    We set out the scope, deliverables, fee basis and assumptions in writing before work starts.

  5. Conflicts and authorisation checks

    We confirm there is no conflict and identify any part of the work that must be done by an authorised professional.

  6. Engagement and specialist appointment

    You sign our engagement terms, and any independent specialist is engaged by you directly under their own terms.

  7. Coordination

    We carry out the agreed equipment supply & installation coordination work, keep a single record of documents and decisions, and coordinate the specialists involved. Every interface between suppliers is given an owner and a date, so that delay can be traced to its source.

  8. Reporting and close-out

    We report progress against the agreed scope, hand over the final documents and close the file.

What affects timing

We do not promise durations. Timing depends mainly on:

  • Site readiness and access
  • The number of contractors and interfaces
  • Lead times for equipment and spares
  • Availability of independent engineers for testing

Who does the regulated work

Independent specialists: Chartered engineers; construction counsel.

MITIGATE PLUS (a trading name of MITIGATE LTD) provides commercial coordination only; chartered engineers; construction counsel engaged separately under their own terms carry out any regulated or reserved work. Not a law firm; not FCA-authorised.

MITIGATE PLUS (a trading name of MITIGATE LTD) provides the commercial coordination, documentation and case management described on this page. Litigation, legal representation and legal opinions are handled by independent authorised lawyers, and regulated financial or insurance activity by authorised firms; MITIGATE LTD holds no FCA authorisation for those activities. We do not hold client money, conduct litigation, arrest vessels, enforce judgments, place insurance, broker regulated credit, act as a customs broker, certify goods or classify controlled goods. Regulated or reserved work is carried out by independent, appropriately authorised professionals engaged under their own terms.

Jurisdiction: Whether any part of a matter is regulated depends on the jurisdictions, parties and instruments involved. Every engagement is subject to eligibility screening, local-law review and, where required, the appointment of appropriately authorised independent specialists. We do not suggest that all activities described here are free of licensing requirements in every country.

Frequently asked questions

Who decides whether a test has been passed?

The criteria in the contract and, where needed, an independent engineer. We organise the protocol, witnesses and records; we do not certify the result.

How are delays allocated between contractors?

Through the contracts and the evidence. A clear interface matrix and contemporaneous records make that allocation much easier and reduce disputes.

Do you work on construction projects?

We coordinate the commercial side of equipment supply and installation. Construction counsel and chartered engineers handle legal and technical responsibility.

Why coordination helps

One commercial lead, one record, the right specialists

Contracts go wrong between the drafts: a change agreed by email, a notice period nobody diarised. We keep one version of the terms, one issues list and one obligation register, so your lawyers advise on a clean record and your team performs to it.

Discuss your Equipment Supply & Installation Coordination matter

Send an outline only, without confidential documents. We will reply to confirm fit, likely scope, and which parts need an independent authorised specialist.

Request a consultation

Why clients rely on us

Accountability you can check

Company
MITIGATE PLUS is a trading name of MITIGATE LTD, registered in England & Wales, company no. 12534439.
  • Scope agreed in writing

    Every engagement starts with a written proposal setting out scope, fee basis and exclusions. Nothing proceeds on an assumption.

  • Named deliverables

    You receive defined documents, such as briefs, registers, chronologies, comparison schedules and status reports, not open-ended advice.

  • A structured workflow

    Intake, assessment, proposal, specialist assignment, delivery and reporting, with a clear output at each stage.

  • Independent specialist model

    Reserved legal work and regulated financial or insurance activity are carried out by independent, appropriately authorised professionals you engage on their own terms.

  • Jurisdictional limits stated

    What can be done, and by whom, depends on the jurisdictions involved. We say so at the outset and subject engagements to local-law review where needed.

  • Confidentiality by principle

    Client matters are never used as marketing. Information is shared only with those a matter requires, and we agree how documents are sent before any are exchanged.